We have a gas meter.
I should have working equipment.
I'm ready to assemble furniture.
Finish trim is 90% done.
Electrical will be done next week
Refrigeration will be done next week.
All we need is Electical Final Inspection, Mechanical/plumbing final, environmental health pre and final and we are ready!
We had a little flood! About 12,000 gallons of water smashed through the back wall and filled the entire dining room with 3 inches of water.
Silver lining...it wasn't the new plumbing, and we discovered the f***up the previous plumbers did now, instead of later. They put a galvanized aluminum fitting over a brass fittting. I guess when you add water and pressure, the two metals react and carode. I will post pictures later.